Town Center
Medium voltage distribution and switching system for Town Center Mall and hotel. The project scope included the supply and installation of wiring, switches, metering station, terminations and associated accessories for switching and directing the supply between the North and South sections of the complex. In the basement area, medium voltage trays and wiring were supplied and installed to the transformers low voltage trays and wiring to the main switches in each building. Additionally, the contract included the complex’s grounding network through a perimeter ring connected to ground bars embedded in the perimeter walls and carried to each technical room with connection end points for each end user.
Project: Town Center
Client: Constructora Tece (Empresas Bern)
Location: Costa del Este, Panamá