80 MW Cativa Thermal Power Plant
Electrical and mechanical erection of 80 MW power plant. The project consisted of the pipefitting, fuel supply systems, cooling system, exhaust, fire protection, ventilation and air conditioning for 10 diesel power generating units of 8 MW each. Two 45 meter stacks were erected. Equipment installation and pipefitting for fuel treatment areas were carried out.
The electrical works consisted of all high voltage switchyard works, tie in to the existing substation, control & protection equipment installation. The Powerhouse low voltage wiring system, lighting, and fire protection were also installed.
Project: 80 MW Cativa Thermal Power Plant
Owner: Bahía Las Minas Corp.
Location: Colon, Panama